Background
Rembrandt House was a disused Edwardian hospital. This was a ‘change of building use’ project, with the property being converted to a total of 80 flats. The overall project took one year to complete, with iMist frequently designing in line with the developers’ programme of works (POW).
Solution
The system was connected to many third-party installations such as AOVs and fire panels which allowed iMist to showcase our system and work with the London Fire Brigade, who were impressed with the capability of our products.